Delivery






Free Delivery & Setup Within 50 Miles!
We deliver across Michigan, Indiana, and Ohio. If you're within 50 miles of our main location in Colon, MI, delivery is free for any building size. From any of our dealer locations across southern lower Michigan, delivery is free for 8', 10', and 12' wide buildings. To protect your yard, we use a machine called a mule to move your building into place; no need to drive heavy trucks across your property. Check out the gallery at the left to see pictures of the mule in action!
Delivering Your Dream!
We want your building delivery to be as smooth, safe, and stress-free as possible! 🚚🏡 To help us get your new building in place without any hiccups, we've put together a few simple site requirements to have ready before our delivery team arrives. Taking care of these details ahead of time helps protect your property, your new building, and our delivery crew. Please keep in mind that if your site isn't ready, delivery may need to be rescheduled, and additional fees may apply.




Avery Building & Barns Portable Building Delivery Requirements
Access Path Clearance
Horizontal Clearance: Customer must provide an access path with a minimum of + 2 feet of total horizontal clearance. Customers must also ensure that the delivery path and final building location maintain a minimum of 2 feet of clearance from all structures, including but not limited to; houses, garages, fences and/or sheds. Important: Overhangs, roof eaves, and gutters must also be measured. These are commonly overlooked and must NOT obstruct the delivery path or placement area. Example: A 10’-wide building requires a minimum of 12’ of accessible width.
Vertical Clearance: A minimum of 14 feet of vertical clearance from ground level is required along the full delivery path.This includes clearance under trees, electrical wires, structures, and any overhead obstructions.
Vegetation: All trees, bushes, and vegetation must be cut back to meet the required clearances listed above.If, in the driver’s judgment, the vegetation risks scratching or damaging the building or equipment, delivery may be refused, resulting in rescheduling fees or additional charges. If vegetation is not cleared and the customer still desires to accept the delivery, the customer may do so at their own discretion. Avery Building & Barns are not responsible for damages to structures delivered without meeting the requirements stated in this document. Exceptions to these rules are at the Driver’s and Homeowner’s discretion.
Recommended Building Foundation / Pad: Avery Building & Barns strongly recommends that all portable buildings be placed on a properly constructed concrete, gravel, or rock base for best performance. A gravel base promotes accurate leveling of the building, helps prevent settling caused by weather changes, reduces weed growth beneath the building, supports warranty compliance and improves long-term stability and drainage.
Important Note: Ground naturally moves during seasonal warm/cold cycles. A compacted and level gravel pad significantly minimizes shifting and reduces the need for future adjustments.
Gravel or Rock - Recommended materials include asphalt millings, crushed concrete or stabilized gravel. We DO NOT recommend using pea gravel, river rock, or sand. These materials cause delivery equipment to become stuck and can also cause the building to sink and become unlevel over time. Use of substrate materials that do not meet the standard for Avery Building & Barns will void the warranty of the building. The ideal base will be 3-4” deep after compacting and leveling, constructed of an approved material, and be at least a foot wider than the ordered building on any side, including ramps. (Example: If you ordered a 14’ x 24’ building, we recommend a gravel base that measures 16’ x 26’.)
Cement Blocks & Pavers - In the event you would like to not provide a gravel base, you can supply our delivery drivers with concrete pavers. These will not be provided for you. We recommend ‘2 x 8 x 16 Solid Construction Block’ from Menards. Model Number: 1796200, Menards SKU: 1796200.
Gravel Base Contractors: We recommend a gravel base for every structure. Below are independent contractors who have provided gravel pad installation in the past. These individuals are not affiliated with Avery Building & Barns. Customers are responsible for verifying availability, pricing, and workmanship.
Gunnett Excavating (Plainwell) – (269) 806-6292
West Michigan Earthworks, Matt (Jones) – (260) 463-1232
Upston Excavating (Battle Creek) – (269) 986-0792
Miracle's Landscape, Hunter (Centreville) - (269) 467-0352
Delivery: In the event that the substrate prepared for the building sold by Avery Building & Barns has not been adequately prepared for the delivery team as instructed above, the delivery team (Backroads Trucking, LLC) reserves the right to reschedule or refuse delivery or charge the customer an additional fee(s) to prepare the base, or supply additional footing materials, with a minimum fee of $250.
Examples of Bad Deliveries: What Not to Do
Example 1: Bare Ground
The customer did not prepare ground and wanted us to install it in the location of their previous building.
What was wrong:
No gravel base was provided.
The surrounding greenery was not cleared or cut back.
Blocks supplied were not sufficient. (Please contact your salesperson for the recommended amount of blocks per your specific building style and size should you opt to not supply a gravel base.)
The ground was unlevel. To level the building multiple blocks had to be provided creating an unsafe environment in the long run.



Example 2: Gravel Application
The customer hired an excavator to prepare the ground for his new building and spent a lot of money to make it look nice.
What was wrong:
The customer built the sub walls too high for our equipment causing damage to the treated lumber used on the walls.
Because our tractors are small, we are limited to the variances they can handle. Anything beyond a 6” drop, needs to be evaluated by your dealer or another member of our Avery Sales staff.



Example 3: Concrete Application
The customer hired a contractor to pour their concrete.
What was wrong:
The customer's concrete pad was not poured with the ramps in mind.
The concrete sits higher than 6” from the ground, concrete was damaged by the tractor when the operator backed off of the concrete pad.



All of these examples cited are considered the responsibility of the customer. Avery Building and Barns and its affiliates are not responsible for damage caused in any of these or similar instances as outlined above.
Acceptable Foundations
A good foundation, ready for delivery, will include:
Low profile, easy to drive over, 6” or lower from the ground.
Level, packed surface.
3-4” thick.


Questions about delivery?
For any additional questions, please contact your local dealer.